1 |
Consultancy Services For Authority’s Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section section Indapur-Tala –Mandad –Agardanda section of NH-753F ( Length - 42.345 km) On EPC Basis. (PKG-30) |
Ministry of Road Transport and Highways |
2 |
Consultancy Services For Authority’s Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section section Mangaon –Mhalsa- Dighi Port section of NH-753F (Length - 54.75 km)On EPC Basis. |
Ministry of Road Transport and Highways |
3 |
Consultancy Services For Authority’s Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section section Wakan Pali Khopoli section of NH-548A (Length - 40.51 km) On EPC Basis. |
Ministry of Road Transport and Highways |
4 |
Consultancy Services for Authority’s Engineer Services for Rehabilitation & Upgradation of Two laning of Maheshkhunt – Saharsa - Purnea section of NH 107 from km. 0.000 to km. 90.000 in the State of Bihar on EPC Mode (Package-I)” |
National Highways Authority of India |
5 |
Independent Engineer services during Operation & Maintenance Period for Tuljapur–Ausa (including Tuljapur Bypass) Section of NH- 361 from Km.0.000 to Km.55.835 under NHDP Phase-IV in the State of Maharashtra under Hybrid Annuity Mode - IE-O&M/NH-361/NAG-13 |
National Highways Authority of India |
6 |
Construction of Access Controlled
Expressway
of Bharuch to
Dahej Section from Desing
Km 208.000
to Design km 246.675
(Total Design Length
38.675) of SH
6 in the state
of Gujarat on Hybrid Annuity mode (HAM)
|
GSRDC |
7 |
Construction of Four lane
High Speed
corridor of
Vataman to
Pipali section
from Design
Km 93+811
(Total Length
Km 24.111)
of SH 6 in the
State of
Gujarat on
Hybrid
Annuity Mode
(HAM)
|
GSRDC |
8 |
Independent Engineer services for 4 Laning of existing 2-Laning Stretch from Dive ghat at Km220.900 to Hadapsar at Km
234.150 (Pkg-6) on Mohol-Alandi section (Design Length 13.25 Km) of NH-965 in the State of Maharashtra on HAM under NH
(O). |
National Highways Authority of India |
9 |
Consultancy Servicesf for Authority’s Engineer Construction of 2 major bridges and 1 minor bridge along with approaches
on Wakan Pali–Khopoli road NH-548A (old SH-93) near Pali in Dist. Raigad in the state of Maharashtra on EPC mode in the
State of Maharashtra. |
Ministry of Road Transport and Highways |
10 |
Independent Engineer for Construction of balance works (VUP, Service Road, Drain, Junction Development, Bus-Bay and FOB)
for four laning of Tuljapur-Ausa under NHDP Phase-IV in the State of Maharashtra on EPC Mode. |
National Highways Authority of India |